b'Works Practices ConfirmationPre Renovation Set-upYES NO N/ASigns posted, clearly defining the work area before commencing, and remaining during renovation.Work area isolated to prevent dust and debris leaving, including plastic sheeting to confine area, tack mats to preventing tracking, dual entry sheeting for vertical entry way.Work area on exterior protected with sheeting 20 feet from edges, floors below, and all at risk foliage covered.All objects removed, and/or covered with plastic sheeting with edges and seams taped.All ducts and openings in work area covered.Windows and Doors covered in work area (interior), or within 20 feet (exterior) with plastic sheeting withedges and seams sealed, and applied dual sheeting for entry into work area or into house.Interior Floor space covered up to 6 feet beyond perimeter or sufficient to contain any debris (interior) orground covered to 10 feet (exterior) .Precautions used to ensure all personnel, tools and other items, and containers of waste are free of dust anddebris.Precautions used to ensure no contamination from forbidden practicesYES NO N/AOpen flame, burning, torching of Lead Paint.Use of sanding/grinding, power-planing machines without HEPA filtered exhaust.Use of Heat Gun to above 100oF.Training and Protection of WorkerYES NO N/AWorkers properly trained by Certified Renovator in proper Lead Safe Work Practices.Workers trained on application of these practices on site.Workers instructed on proper use and application of all safety and protection equipment and clothing such as foot, hand, head and body protective garments, breathing masks, and proper cleaning of hands, face etc,during and after entering and exiting the work area, and hygiene practices for food and beverage.Handling Waste and Initial CleaningYES NO N/AWaste contained to prevent releases of dust/debris before waste is removed from work area.Waste removed from work area was stored under containment in enclosure, or behind barrier, at conclusionof each workday to prevent releases of dust and debris.All waste transported was contained to prevent releases of dust and debris.Work area cleaned until no dust and debris and residue remains at end of each day.All paint chips, debris and components collected without allowing dust dispersal in heavy-duty bags (6mil) and properly sealed.All protective sheeting misted, folded dirty-side inward, properly taped shut or sealed in heavy duty bag (6 mil).All sheeting used to isolate work areas from non-contaminated rooms, remained in place until final cleaningand proper removal of other sheeting, then properly disposed of in sealed bags, as waste'