b'REQUIRED WORK PRACTICESFOR RENOVATIONSEPA RRP RULE: (40 CFR 745.85)Interior Renovations Exterior RenovationsInformation Distribution See Previous Table40 CFR 745.84Work Area Identification Physical area that the Certified Renovator establishes to contain the dust anddebris generated by renovation.Occupant Protection Where to Post Signs At perimeter of work area What to say on signs Warn occupants and others not involved in renovation to remain outside thework area.OSHA Lead Warning Sign is acceptable. What Language Primary language of occupants to extent practicable When to post signs? Before beginning renovation until after post-renovation cleaning verification is completed.Containing the Work Area IsolatetheWork Area Take steps necessary to ensure no dust or debris leaves work area while renovation is being performed.MaintainintegrityofEnsure plastic and other impermeable materials are not torn or displaced.containment. Emergency exit Ensure containment installed so that it does not interfere with occupant andworker egress in an emergency Objectsin theWorkArea Remove or cover with impermeablematerial with all seams and edges Not Requiredsealed. Ducts Opening inClose and cover all ducts with imper- Not RequiredWork Area. meable material. Windows and DoorsClose windows and doors.Cover Close doors and windows within 20,in Work Area doors with impermeable material.and, on multi-story buildings, allbelow renovation. Access Doors If door is used while job is being performed, allow workers to pass throughwhile confining dust and debris to work area. Floors/Ground Cover with taped-down impermeable Cover with disposable impermeableVertical containment is required for somematerial 6 beyond the perimeter of material extending 10 beyondexterior renovations close to sidewalk surfaces undergoing renovation or a perimeter of surfaces undergoing street pr property boundry;or buildingssufficient distance to contain the dust, renovation or a sufficient distance tomore than 3 stories high. Put plastic over whichever is greater. collect falling paint debris, whicheverrigid structure or scaffold to contain fallingis greater, unless the property line debris within the 10 foot protected area. prevents 10 of such ground covering. 2010-2014 AWDI, LLC. All Rights Reserved. May not be copied or distributed without expressed written permission.'