b'BrickmouldInstallationStep 7BPlace drip cap across the header of thebrickmould trim, making sure it extendsout from the sides at least 1 to allow Drip Capwater to drain away and down.Drip capDoor Moulding Step 7CUnfold the WRB on the jams, Fold backagainst the sheathing, allowing the WRBto fold outward from the joint where thewall and the brickmould meet, asshown.If siding, and/or J channel is to beused against the brickmould trim, trimthe WRB back to allow a bead of finishcaulk to seal the joint between the JChannel or siding and the brickmould.Unfolding the WRB along the top to goover the vertical leg of the drip cap, andbend out to accommodate the JChannel and/or siding is the same asfor the jambs.Window Fitters Guide to Window Installation1142020 AWDI, LLC Do not reproduce without permission'