b'Basic Door InstallationStep 5Cute WRB at corners to allowfolding back and taping about 6,exposing the flashing as shown.Place a bead of caulk down thejamb face and across the face ofthe header to allow the mountingflange of the door to rest againstthis sealant.Simplex Cap Nails OVER fin allowsStep 6 frame to move better than nailsthrough mounting slotsPlace mounting flange of dooragainst the caulk/sealant as thedoor is placed in the opening. Donot put sealant across the sill panbecause the pan needs to able todrain outward any wanter thatgets into the cavity.If the door is being mountedthrough the flange/fin, useSimplex nails or similar to besure that the flange/fin canexpand and contract without disturbing the flashing or theseal.Place drip cap over the top of thedoor to direct water out to thesides. If possible, bend the hori-zontal member of the cap down atboth jambs as shown.Window Fitters Guide to Window Installation112 2020 AWDI, LLC Do not reproduce without permissionDooMrDoor M'