b'Basic Door InstallationStep 1Standard construction stepsapply. Proper framing andsheathing is also assumed asshown.The sill is shown as even with the deckperhaps the toughest to make level as required for proper installation.Drip sill (set down 1/2 to3/4 is better because its easier make level after the deck is built, and toaccommodate the sill pan. Drop sills are more effective at keeping water from blowingunder the doors, as well.These instructions are basicfor either approach.Step 2After the sheathing is appliedto the wall, install 9 wide,flexible flashing on the sill,overlapping the sill plate, andup the jambs, 6 to 9 high.Place a bead of caulk/sealantalong the top of the flashing tohelp secure the sill pan.Prepare metal sill pan, or usea pre-manufactured plasticpan and place on top of theflashingtight between thejambswith the lip of the sillpan against the sill plate.If shims are needed, use flatshims of 1/8 or less. Makesure they lie in a bead ofcaulk/sealant.Window Fitters Guide to Window Installation1102020 AWDI, LLC Do not reproduce without permission'