b'Integral J-Channel InstallStep 3: Step 4:Using another layer Finish installing theof flashing, starting overlapping buildingwith the sill, overlap paper.strips to cover thejambs and header Remember to leavealso. the bottom of thewindow unsealed toIf you choose to allow drainage of anyapply building paper, water or condensedstart the first strip moisture in thetucked under the opening cavity.bottom (sill) flashing.The goal is always tooverlap in ship lapfashion to directwater down andaway from the newwindow.Step 5: Step 6:Integral J-Channel Finish applying theframes allowexterior siding orinstallation of the paneling - or evensiding by tucking stucco.it inside the space created by the j- Proper drainage andchannel and the finish trim all in onewindow frame. application.Window Fitters Guide to Window Installation1022020 AWDI, LLC Do not reproduce without permission'